Entry Details
Organization: | GE3S - Global Energy And Environmental Engineering Services |
Login ID: | ge3s.org |
Category applied for: | COMMISSIONING/RE-COMMISSIONING COMPANY OF THE YEAR |
Submission date: | 28-Oct-2024 |
Submission Entry: | 1.) What systemic transformation are you able to report as a commissioning/re-commissioning company?Answer: I. Indeed, by offering consultancy services in a variety of verticals, including energy, water, environmental, green building, waste, corporate social responsibility, and climate change, our organization is concentrating on more sustainable and environmentally friendly future developments. 2.) Given that buildings consume 40% of global energy, within which at least 40% is consumed by HVAC systems, how has the goal of 1.5 C additionally impacted your commissioning/re-commissioning opportunities? What specific strategies have you incorporated in your commissioning/re-commissioning procedures in order to support the 1.5 goal? (206)Answer: The primary goals of our HVAC system commissioning or retro commissioning are water-cooled chiller COP of greater than 6.1 COP and overall plant efficiency of 1kW/TR and 0.70kW/TR. New technologies will be used for the installation, operation, and monitoring of all airside equipment. 3.) What are you doing as a company to highlight and demonstrate the benefits of commissioning, re-commissioning or retro-commissioning for better energy efficiency and reliability of air conditioning and ventilation? (207)Answer: Our organization specializes in retro-commissioning and showcasing the use of improving indoor environmental conditions, including building pressure control, relative humidity, and room temperature. Additionally, increase air balance, guarantee sufficient outside air intake, and lessen moisture intrusion. Earning points toward ENERGY STAR certification by assisting with the certification process. 4.) In the past one year, how many of your commissioning/re-commissioning/retro-commissioning projects have secured a Green Building certification? And under which rating systems and at what levels of certification? Please highlight also the carbon emission reductions achieved on these projects. (208)Answer: Totally 6 Projects Cx done in last year for LEED & ESTIDAMA Certification 5.) What is your model of engagement with different stakeholders on either side of the testing & handover process to optimise the commissioning, re-commissioning or retro-commissioning process? (209)Answer: From design to installation, erection, commissioning, and operation, our model involves the team. 6.) What is the general scope of your work that you feel distinguishes you from your competitors? (210)Answer: Our responsibility is to assign a specific person to oversee all commissioning-related tasks. 7.) What actions do you accord to IEQ performance of the building? (211)Answer: IEQ performance will increase with better fresh air delivery and occupied space monitoring. 8.) How do you ensure the building enjoys optimal IEQ without compromising on energy efficiency? (212)Answer: By conducting an occupancy comfort study covering a range of subjects, including as vistas, thermal comfort, and illumination. |
Supporting documents: | |
References: | CCAUAE2425 || satyapal.singh@ge3s.org |